Raw Material Inward
| Supply Date | 09 Aug 2020 |
|---|---|
| Contract Number | SAFAL/P/MN ORE/08.68/2020 |
| Item | Manganese Ore |
| Supplier Name | Chishimba Katongo |
| Grade (%) | High (44% - 50%) |
| Lot Number | Chishimba Katongo- Mn Ore |
| Deviance | 0 |
| Inward Quantity | 20.52 |
| Freight | 16.524 |
| Loading Charges | 1.34 |
| Offloading Charges | 0 |
| Royalty | 8.37 |
| Other Cost | 0 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 1461.72 |
| Conversion Rate (Please insert 1 if no conversion is required) | 1 |
| Inward Status | Accepted |