Supply Date04 Aug 2020
Contract NumberSAFAL/P/MN ORE/07.65/2020
ItemManganese Ore
Supplier NameStrong Concrete & Roofing Co Ltd
Grade (%)Medium (38% - 44%)
Lot NumberStrong Concrete & Roofing - Mn Ore
Deviance0
Inward Quantity43.83
Freight10.465
Loading Charges0
Offloading Charges0
Royalty4.72
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost2681.74
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn42.10
Fe4.70
SiO210.12
Al2O34.88
P0.16
Size 0-10MM1.60
Size 10-20MM2.10
Size 20-100MM96.30
Size +100MM-