Supply Date03 Aug 2020
Contract NumberSAFAL/P/MN ORE/07.65/2020
ItemManganese Ore
Supplier NameStrong Concrete & Roofing Co Ltd
Grade (%)Medium (38% - 44%)
Lot NumberStrong Concrete & Roofing - Mn Ore
Deviance0
Inward Quantity30.57
Freight10.465
Loading Charges0
Offloading Charges0
Royalty4.72
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1870.43
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn40.60
Fe6.55
SiO218.60
Al2O36.20
P0.15
Size 0-10MM5.10
Size 10-20MM6.50
Size 20-100MM88.40
Size +100MM-