Supply Date27 Jul 2020
Contract NumberSAFAL/P/MN ORE/07.61/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine (36-38%) 2
Deviance0
Inward Quantity31.415
Freight8.798
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1532.99
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn32.08
Fe6.11
SiO215.48
Al2O37.26
P0.17
Size 0-10MM27.22
Size 10-20MM34.62
Size 20-100MM38.16
Size +100MM-