Supply Date31 Oct 2019
Contract NumberOS/MN ORE/08/2019
ItemManganese Ore
Supplier NameMusonda mine
Grade (%)Ultra Low (Below 32%)
Lot NumberMusonda Mine 26%
Deviance0
Inward Quantity17.88
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost405.32
Conversion Rate (Please insert 1 if no conversion is required)13.19
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn26.8
Fe15.66
SiO210.1
Al2O35.9
P0.2
Size 0-10MM10-100mm
Size 10-20MM-
Size 20-100MM-
Size +100MM-