Supply Date15 Jul 2020
Contract NumberSAFAL/P/MN ORE/07.57/2020
ItemManganese Ore
Supplier NameGeofrey Kunda
Grade (%)High (44% - 50%)
Lot NumberGeofrey Kunda- Mn Ore- MG
Deviance0
Inward Quantity13.94
Freight100
Loading Charges0
Offloading Charges0
Royalty0
Other Cost43.47
Quality Deviance0
Grade Deviance0
Total Cost799.89
Conversion Rate (Please insert 1 if no conversion is required)18.185
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn30.2
Fe25.5
SiO213.62
Al2O33.95
P0.18
Size 0-10MM5.61
Size 10-20MM3.92
Size 20-100MM90.47
Size +100MM0