Maintenance Details
| Date | 22 May 2026 |
|---|---|
| Start Time | 00:30:01 |
| End Time | 00:30:01 |
| Nature Of Maintenance | Mechanical |
| Equipment | HYDRAULIC POWER PACK NO. 2 |
| Type of Maintenance | Scheduled Maintenance |
| Details | 1. checking loose parts and check the hydraulic oil level in the tank. 2. check solenoid valve working conditions and adjust oil pressure. 3. check hydraulic line leakage. |
| Remark | (not set) |
| Furnace | Furnace II |
| Status | On going |