Maintenance Details
| Date | 16 May 2026 |
|---|---|
| Start Time | 00:34:01 |
| End Time | 00:34:01 |
| Nature Of Maintenance | Electrical |
| Equipment | WASHING PLANT |
| Type of Maintenance | Scheduled Maintenance |
| Details | WASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. 5. check the high mast lights also. |
| Remark | (not set) |
| Furnace | Other |
| Status | On going |