Supply Date26 Jun 2020
Contract NumberSAFAL/P/MN ORE/05.39/2020
ItemManganese Ore
Supplier NameLazy Cat Investment
Grade (%)High (44% - 50%)
Lot NumberLazy Cat Investment- Mn Ore
Deviance0
Inward Quantity38.81
Freight11.23
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost2842.06
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn48.50
Fe5.18
SiO28.30
Al2O34.29
P0.125
Size 0-10MM6.12
Size 10-20MM4.68
Size 20-100MM89.20
Size +100MM-