Maintenance Details
| Date | 14 May 2026 |
|---|---|
| Start Time | 00:18:01 |
| End Time | 00:18:01 |
| Nature Of Maintenance | Electrical |
| Equipment | CHIPPING YARD CRANE NO. 1 |
| Type of Maintenance | Scheduled Maintenance |
| Details | CHIPPING YARD E.O.T. CRANE 1 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. |
| Remark | (not set) |
| Furnace | Other |
| Status | On going |