Maintenance Details


Date08 May 2026
Start Time00:13:01
End Time00:13:01
Nature Of MaintenanceElectrical
EquipmentHYDRAULIC POWER PACK NO. 2
Type of MaintenanceScheduled Maintenance
DetailsFURNACE 1

1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
Remark(not set)
FurnaceFurnace I
StatusOn going