Maintenance Details


Date02 May 2026
Start Time00:13:01
End Time00:13:01
Nature Of MaintenanceElectrical
EquipmentWASHING PLANT
Type of MaintenanceScheduled Maintenance
DetailsWASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
5. check the high mast lights also.
Remark(not set)
FurnaceOther
StatusOn going