Supply Date20 Jun 2020
Contract NumberSAFAL/P/IRON ORE/06.05/2020
ItemIron Ore
Supplier NameAlex siulemba
Grade (%)N/A
Lot NumberAlex Siulemba- Iron Ore
Deviance0
Inward Quantity30.415
Freight250
Loading Charges0
Offloading Charges0
Royalty15
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1016.59
Conversion Rate (Please insert 1 if no conversion is required)16.904
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe68.79
Mn1.14
SiO22.94
Al2O31.50
P0.13
Size 0-10MM10-200mm