Supply Date31 Oct 2019
Contract NumberOS/MN ORE/47/2019
ItemManganese Ore
Supplier NamePeniel Mines Limited
Grade (%)Low (32% - 38%)
Lot NumberPeniel Mining - Mn ore 35-38%
Deviance0
Inward Quantity129.824
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost5488.53
Conversion Rate (Please insert 1 if no conversion is required)13.19
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn34.67
Fe14.85
SiO29.07
Al2O35.92
P0.21
Size 0-10MM10-100mm
Size 10-20MM-
Size 20-100MM-
Size +100MM-