| Supply Date | 01 Nov 2019 |
| Contract Number | OS/MN ORE/28/2019 |
| Item | Manganese Ore |
| Supplier Name | Morgan kaunda |
| Grade (%) | Low (32% - 38%) |
| Lot Number | Morgan Kunda - LG |
| Deviance | 0 |
| Inward Quantity | 3 |
| Freight | 0 |
| Loading Charges | 0 |
| Offloading Charges | 0 |
| Royalty | 0 |
| Other Cost | 0 |
| Quality Deviance | (not set) |
| Grade Deviance | (not set) |
| Total Cost | 142.15 |
| Conversion Rate (Please insert 1 if no conversion is required) | 13.19 |
| Inward Status | Accepted |
|---|
Raw Material Test
Showing 1-9 of 9 items.
| Raw Material Component | Value |
| Mn | - |
| Fe | - |
| SiO2 | - |
| Al2O3 | - |
| P | - |
| Size 0-10MM | - |
| Size 10-20MM | - |
| Size 20-100MM | - |
| Size +100MM | - |