Supply Date16 May 2020
Contract NumberSAFAL/P/MN ORE/03.31/2020
ItemManganese Ore
Supplier NameLazy Cat Investment
Grade (%)High (44% - 50%)
Lot NumberLazy Cat Investment- Mn Ore
Deviance0
Inward Quantity44.01
Freight11.23
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0.75
Quality Deviance0
Grade Deviance0
Total Cost3255.86
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn47.20
Fe3.10
SiO211.50
Al2O36.70
P0.14
Size 0-10MM3.90
Size 10-20MM3.50
Size 20-100MM92.60
Size +100MM-