Supply Date02 Apr 2026
Contract NumberSAFAL/P/IRON ORE/02/2026/30
ItemIron Ore
Supplier NameACCELETATED GERMINATION CORPORATION
Grade (%)N/A
Lot NumberAccelerated Iron Ore 2026
Deviance0
Inward Quantity29.6
Freight0
Loading Charges0
Offloading Charges0
Royalty0.277631731
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1311.68
Conversion Rate (Please insert 1 if no conversion is required)19.3025
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe69.50
Mn0.67
SiO22.58
Al2O36.04
P0.167
Size 0-10MM4.64