Supply Date27 Feb 2026
Contract NumberSAFAL/P/IRON ORE/02/2026/31
ItemIron Ore
Supplier NameAlex siulemba
Grade (%)N/A
Lot NumberAlex Iron Ore 2026
Deviance0
Inward Quantity29.06
Freight0
Loading Charges0
Offloading Charges0
Royalty0.263047156
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1319.48
Conversion Rate (Please insert 1 if no conversion is required)18.8293
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe65.10
Mn1.91
SiO24.28
Al2O34.97
P0.164
Size 0-10MM6.54