Supply Date25 Feb 2026
Contract NumberSAFAL/P/IRON ORE/02/2026/30
ItemIron Ore
Supplier NameACCELETATED GERMINATION CORPORATION
Grade (%)N/A
Lot NumberAccelerated Iron Ore 2026
Deviance0
Inward Quantity29.8
Freight0
Loading Charges0
Offloading Charges0
Royalty0.263186547
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1353.8
Conversion Rate (Please insert 1 if no conversion is required)18.8193
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe65.60
Mn0.68
SiO24.35
Al2O36.75
P0.159
Size 0-10MM5.80