Supply Date23 Feb 2026
Contract NumberSAFAL/P/MANGANESE ORE/02/2026/36
ItemManganese Ore
Supplier NameTwatota Mining Company Limited
Grade (%)Medium (38% - 44%)
Lot NumberTwatota Mn 42g- 2026
Deviance0
Inward Quantity34.72
Freight17.2872340425
Loading Charges0
Offloading Charges0
Royalty4.07316281
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3310.91
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.43
Fe3.40
SiO211.12
Al2O35.76
P0.124
Size 0-10MM58.64
Size 10-20MM25.56
Size 20-100MM15.80
Size +100MM.
MOISTURE6.80