Supply Date21 Feb 2026
Contract NumberSAFAL/P/MANGANESE ORE/02/2026/36
ItemManganese Ore
Supplier NameTwatota Mining Company Limited
Grade (%)Medium (38% - 44%)
Lot NumberTwatota Mn 42g- 2026
Deviance0
Inward Quantity33.8
Freight17.2872340425
Loading Charges0
Offloading Charges0
Royalty4.034967896
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3221.89
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.24
Fe3.92
SiO29.29
Al2O36.32
P0.123
Size 0-10MM58.60
Size 10-20MM26.28
Size 20-100MM15.12
Size +100MM.
MOISTURE6.24