Raw Material Inward
| Supply Date | 21 Feb 2026 |
|---|---|
| Contract Number | SAFAL/P/IRON ORE/02/2026/31 |
| Item | Iron Ore |
| Supplier Name | Alex siulemba |
| Grade (%) | N/A |
| Lot Number | Alex Iron Ore 2026 |
| Deviance | 0 |
| Inward Quantity | 30.3 |
| Freight | 0 |
| Loading Charges | 0 |
| Offloading Charges | 0 |
| Royalty | 0.261861382 |
| Other Cost | 0 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 1369.58 |
| Conversion Rate (Please insert 1 if no conversion is required) | 18.9146 |
| Inward Status | Accepted |