Supply Date19 Feb 2026
Contract NumberSAFAL/P/IRON ORE/02/2026/30
ItemIron Ore
Supplier NameACCELETATED GERMINATION CORPORATION
Grade (%)N/A
Lot NumberAccelerated Iron Ore 2026
Deviance0
Inward Quantity26.5
Freight0
Loading Charges0
Offloading Charges0
Royalty0.263058266
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1203.29
Conversion Rate (Please insert 1 if no conversion is required)18.8286
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe67.12
Mn0.65
SiO24.15
Al2O36.86
P0.145
Size 0-10MM5.85