Raw Material Inward
| Supply Date | 12 Feb 2026 |
|---|---|
| Contract Number | SAFAL/P/IRON ORE/02/2026/31 |
| Item | Iron Ore |
| Supplier Name | Alex siulemba |
| Grade (%) | N/A |
| Lot Number | Alex Iron Ore 2026 |
| Deviance | 0 |
| Inward Quantity | 33.96 |
| Freight | 0 |
| Loading Charges | 0 |
| Offloading Charges | 0 |
| Royalty | 0.266750873 |
| Other Cost | 0 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 1563.68 |
| Conversion Rate (Please insert 1 if no conversion is required) | 18.5679 |
| Inward Status | Accepted |