Raw Material Inward
| Supply Date | 09 Feb 2026 |
|---|---|
| Contract Number | SAFAL/P/MANGANESE ORE/01/2026/8 |
| Item | Manganese Ore |
| Supplier Name | Twatota Mining Company Limited |
| Grade (%) | Medium (38% - 44%) |
| Lot Number | Twatota Mining Mn +40% |
| Deviance | 0 |
| Inward Quantity | 34.04 |
| Freight | 17.4797906727 |
| Loading Charges | 0 |
| Offloading Charges | 0 |
| Royalty | 4.171670625 |
| Other Cost | 0.1542303203 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 3295.27 |
| Conversion Rate (Please insert 1 if no conversion is required) | 1 |
| Inward Status | Accepted |