Supply Date03 Feb 2026
Contract NumberSAFAL/P/MANGANESE ORE/01/2026/8
ItemManganese Ore
Supplier NameTwatota Mining Company Limited
Grade (%)Medium (38% - 44%)
Lot NumberTwatota Mining Mn +40%
Deviance0
Inward Quantity35.14
Freight16.6240409207
Loading Charges0
Offloading Charges0
Royalty4.063570344
Other Cost-2.2196926487
Quality Deviance0
Grade Deviance0
Total Cost3284.46
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
SiO27.15
Fe3.02
Mn41.18
Size 20-100MM14.34
Size 10-20MM34.36
Size 0-10MM51.30
P0.127
Al2O33.49
MOISTURE4.85
Size +100MM.