Supply Date29 Sep 2025
Contract NumberSAFAL/P/MANGANESE ORE/06/2025/41
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand ZMW 2070
Deviance0
Inward Quantity31.22
Freight0
Loading Charges0
Offloading Charges0
Royalty3.681705
Other Cost4.32511210762
Quality Deviance0
Grade Deviance0
Total Cost2963.72
Conversion Rate (Please insert 1 if no conversion is required)23.8141
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.15
Fe1.15
SiO218.30
Al2O34.99
P0.242
Size 0-10MM13.68
Size 10-20MM5.41
Size 20-100MM50.13
Size +100MM30.78
MOISTURE2.14