Raw Material Inward
| Supply Date | 22 Sep 2025 |
|---|---|
| Contract Number | SAFAL/P/MANGANESE ORE/06/2025/41 |
| Item | Manganese Ore |
| Supplier Name | AKHAND RESOURCES LIMITED |
| Grade (%) | Medium (38% - 44%) |
| Lot Number | Akhand ZMW 2070 |
| Deviance | 0 |
| Inward Quantity | 38.5 |
| Freight | 0 |
| Loading Charges | 0 |
| Offloading Charges | 0 |
| Royalty | 3.707036 |
| Other Cost | 4.32831168831 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 3658.24 |
| Conversion Rate (Please insert 1 if no conversion is required) | 23.7975 |
| Inward Status | Accepted |