Supply Date31 Aug 2025
Contract NumberSAFAL/P/IRON ORE/07/2025/58
ItemIron Ore
Supplier NameJIMMY BANDA
Grade (%)N/A
Lot NumberIron Ore- JIMMY BANDA
Deviance0
Inward Quantity27.72
Freight0
Loading Charges0
Offloading Charges0
Royalty0.2160200297
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost829.41
Conversion Rate (Please insert 1 if no conversion is required)23.565
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe64.27
Mn0.52
SiO25.29
Al2O34.92
P0.142
Size 0-10MM4.12