Supply Date26 Aug 2025
Contract NumberSAFAL/P/IRON ORE/07/2025/58
ItemIron Ore
Supplier NameJIMMY BANDA
Grade (%)N/A
Lot NumberIron Ore- JIMMY BANDA
Deviance0
Inward Quantity31.02
Freight0
Loading Charges0
Offloading Charges0
Royalty0.21933540639
Other Cost-0.00128949065
Quality Deviance0
Grade Deviance0
Total Cost938.1
Conversion Rate (Please insert 1 if no conversion is required)23.315
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe66.43
Mn1.18
SiO24.89
Al2O33.85
P0.143
Size 0-10MM4.13