Supply Date25 Aug 2025
Contract NumberSAFAL/P/MANGANESE ORE/08/2025/57
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $82
Deviance0
Inward Quantity34.38
Freight13.0151843817
Loading Charges0
Offloading Charges0
Royalty3.2765228
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3001.09
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.64
Fe2.73
SiO29.32
Al2O36.12
P0.120
Size 0-10MM50.35
Size 10-20MM33.41
Size 20-100MM16.24
Size +100MM.
MOISTURE4.35