Supply Date23 Aug 2025
Contract NumberSAFAL/P/MANGANESE ORE/08/2025/57
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $82
Deviance0
Inward Quantity34.06
Freight13.0151843817
Loading Charges0
Offloading Charges0
Royalty3.4117921
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost2977.76
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.45
Fe3.12
SiO28.60
Al2O36.92
P0.124
Size 0-10MM50.24
Size 10-20MM32.64
Size 20-100MM17.12
Size +100MM.
MOISTURE3.92