Supply Date23 Aug 2025
Contract NumberSAFAL/P/MANGANESE ORE/08/2025/57
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $82
Deviance0
Inward Quantity35.6
Freight13.0151843817
Loading Charges0
Offloading Charges0
Royalty3.2699067
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3107.35
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.60
Fe2.50
SiO28.49
Al2O36.12
P0.122
Size 0-10MM49.60
Size 10-20MM33.90
Size 20-100MM16.50
Size +100MM.
MOISTURE4.20