Supply Date22 Aug 2025
Contract NumberSAFAL/P/MANGANESE ORE/08/2025/57
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $82
Deviance0
Inward Quantity35.12
Freight13.0151843817
Loading Charges0
Offloading Charges0
Royalty3.3999946
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3070.02
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.38
Fe2.73
SiO26.42
Al2O35.78
P0.123
Size 0-10MM50.39
Size 10-20MM32.11
Size 20-100MM17.50
Size +100MM.
MOISTURE4.50