Supply Date19 Aug 2025
Contract NumberSAFAL/P/MANGANESE ORE/08/2025/57
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $82
Deviance0
Inward Quantity42.9
Freight13.0434782608
Loading Charges0
Offloading Charges0
Royalty3.0446134
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3736.08
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.17
Fe2.47
SiO214.45
Al2O34.31
P0.122
Size 0-10MM51.19
Size 10-20MM32.69
Size 20-100MM16.12
Size +100MM.
MOISTURE4.31