Supply Date19 Aug 2025
Contract NumberSAFAL/P/MANGANESE ORE/08/2025/57
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $82
Deviance0
Inward Quantity38.54
Freight13.0434782608
Loading Charges0
Offloading Charges0
Royalty3.4395208
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3371.59
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.57
Fe2.28
SiO28.62
Al2O36.63
P0.120
Size 0-10MM45.30
Size 10-20MM35.60
Size 20-100MM19.10
Size +100MM.
MOISTURE3.52