Supply Date19 Aug 2025
Contract NumberSAFAL/P/MANGANESE ORE/08/2025/57
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $82
Deviance0
Inward Quantity43.96
Freight13.0434782608
Loading Charges0
Offloading Charges0
Royalty3.0557918
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3828.88
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.24
Fe2.25
SiO214.64
Al2O36.10
P0.119
Size 0-10MM50.34
Size 10-20MM35.90
Size 20-100MM13.76
Size +100MM.
MOISTURE3.68