Supply Date18 Aug 2025
Contract NumberSAFAL/P/MANGANESE ORE/08/2025/57
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $82
Deviance0
Inward Quantity34.82
Freight13.0434782608
Loading Charges0
Offloading Charges0
Royalty3.0926629
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3034.08
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.47
Fe2.41
SiO213.78
Al2O34.95
P0.124
Size 0-10MM47.60
Size 10-20MM36.12
Size 20-100MM16.28
Size +100MM.
MOISTURE4.12