Supply Date18 Aug 2025
Contract NumberSAFAL/P/MANGANESE ORE/08/2025/57
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $82
Deviance0
Inward Quantity37.46
Freight13.0434782608
Loading Charges0
Offloading Charges0
Royalty3.4073795
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3275.91
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.38
Fe2.76
SiO211.07
Al2O33.66
P0.121
Size 0-10MM45.68
Size 10-20MM38.82
Size 20-100MM15.50
Size +100MM.
MOISTURE4.50