Supply Date17 Aug 2025
Contract NumberSAFAL/P/MANGANESE ORE/08/2025/57
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $82
Deviance0
Inward Quantity43.04
Freight13.0434782608
Loading Charges0
Offloading Charges0
Royalty3.4395204
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3765.27
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.57
Fe3.24
SiO27.28
Al2O38.10
P0.125
Size 0-10MM51.12
Size 10-20MM33.64
Size 20-100MM15.24
Size +100MM.
MOISTURE4.20