Supply Date17 Aug 2025
Contract NumberSAFAL/P/MANGANESE ORE/08/2025/57
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $82
Deviance0
Inward Quantity35.8
Freight13.0434782608
Loading Charges0
Offloading Charges0
Royalty3.3922152
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3130.2
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.29
Fe3.03
SiO27.12
Al2O37.97
P0.128
Size 0-10MM50.79
Size 10-20MM35.03
Size 20-100MM14.18
Size +100MM.
MOISTURE4.08