Supply Date15 Aug 2025
Contract NumberSAFAL/P/IRON ORE/07/2025/58
ItemIron Ore
Supplier NameJIMMY BANDA
Grade (%)N/A
Lot NumberIron Ore- JIMMY BANDA
Deviance0
Inward Quantity29.74
Freight0
Loading Charges0
Offloading Charges0
Royalty0.21922842377
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost903.07
Conversion Rate (Please insert 1 if no conversion is required)23.22
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe67.12
Mn0.48
SiO24.82
Al2O33.67
P0.143
Size 0-10MM4.63