Supply Date14 Aug 2025
Contract NumberSAFAL/P/MANGANESE ORE/06/2025/41
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand ZMW 2070
Deviance0
Inward Quantity32.54
Freight0
Loading Charges0
Offloading Charges0
Royalty3.411557
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3014.37
Conversion Rate (Please insert 1 if no conversion is required)23.2
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.58
Fe5.11
SiO29.67
Al2O310.05
P0.126
Size 0-10MM7.54
Size 10-20MM15.68
Size 20-100MM70.46
Size +100MM6.32
MOISTURE2.83