Supply Date13 Aug 2025
Contract NumberSAFAL/P/MANGANESE ORE/06/2025/41
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand ZMW 2070
Deviance0
Inward Quantity56.66
Freight0
Loading Charges0
Offloading Charges0
Royalty3.032223
Other Cost-4.05171196611
Quality Deviance0
Grade Deviance0
Total Cost5015.56
Conversion Rate (Please insert 1 if no conversion is required)23.1182
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.19
Fe9.36
SiO211.58
Al2O38.37
P0.121
Size 0-10MM8.50
Size 10-20MM17.54
Size 20-100MM68.22
Size +100MM5.74
MOISTURE2.60