Raw Material Inward
| Supply Date | 04 Aug 2025 |
|---|---|
| Contract Number | SAFAL/P/MANGANESE ORE/06/2025/42 |
| Item | Manganese Ore |
| Supplier Name | Gamcore Zambia Limited |
| Grade (%) | Medium (38% - 44%) |
| Lot Number | Gamcore- ZMW 2040 |
| Deviance | 0 |
| Inward Quantity | 41.12 |
| Freight | 0 |
| Loading Charges | 0 |
| Offloading Charges | 0 |
| Royalty | 3.055838 |
| Other Cost | -4.02383268482 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 3658.08 |
| Conversion Rate (Please insert 1 if no conversion is required) | 22.9396 |
| Inward Status | Accepted |