Supply Date31 Jul 2025
Contract NumberSAFAL/P/MANGANESE ORE/07/2025/49
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDingching Mn 40-44% $82
Deviance0
Inward Quantity36.54
Freight0
Loading Charges0
Offloading Charges0
Royalty3.70305925
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3168.13
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.26
Fe1.94
SiO28.74
Al2O33.27
P0.131
Size 0-10MM8.65
Size 10-20MM24.20
Size 20-100MM67.15
Size +100MM.
MOISTURE1.85