Supply Date26 Jul 2025
Contract NumberSAFAL/P/MANGANESE ORE/06/2025/41
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand ZMW 2070
Deviance0
Inward Quantity50.62
Freight0
Loading Charges0
Offloading Charges0
Royalty2.8123745
Other Cost-5.97688660608
Quality Deviance0
Grade Deviance0
Total Cost4322.12
Conversion Rate (Please insert 1 if no conversion is required)23.3771
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn37.30
Fe5.91
SiO212.03
Al2O310.20
P0.128
Size 0-10MM9.32
Size 10-20MM24.80
Size 20-100MM64.29
Size +100MM1.59
MOISTURE3.15