Supply Date23 Jul 2025
Contract NumberSAFAL/P/MANGANESE ORE/06/2025/41
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand ZMW 2070
Deviance0
Inward Quantity36.22
Freight0
Loading Charges0
Offloading Charges0
Royalty2.9990665
Other Cost-7.87631143014
Quality Deviance0
Grade Deviance0
Total Cost3050.33
Conversion Rate (Please insert 1 if no conversion is required)23.2339
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.40
Fe3.53
SiO217.94
Al2O34.88
P0.119
Size 0-10MM6.75
Size 10-20MM11.24
Size 20-100MM74.77
Size +100MM7.24
MOISTURE2.78