Supply Date21 Jul 2025
Contract NumberSAFAL/P/MANGANESE ORE/06/2025/41
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand ZMW 2070
Deviance0
Inward Quantity51.14
Freight0
Loading Charges0
Offloading Charges0
Royalty2.6950028
Other Cost-12.8607743449
Quality Deviance0
Grade Deviance0
Total Cost4079.58
Conversion Rate (Please insert 1 if no conversion is required)23.0157
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn36.23
Fe6.69
SiO212.45
Al2O312.42
P0.130
Size 0-10MM9.48
Size 10-20MM25.60
Size 20-100MM64.92
Size +100MM.
MOISTURE3.28