Supply Date14 Jul 2025
Contract NumberSAFAL/P/MANGANESE ORE/06/2025/41
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand ZMW 2070
Deviance0
Inward Quantity36.7
Freight0
Loading Charges0
Offloading Charges0
Royalty2.98902394
Other Cost-3.74495912806
Quality Deviance0
Grade Deviance0
Total Cost3244.67
Conversion Rate (Please insert 1 if no conversion is required)23.215
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.32
Fe4.53
SiO216.68
Al2O36.41
P0.121
Size 0-10MM8.52
Size 10-20MM15.28
Size 20-100MM71.00
Size +100MM5.20
MOISTURE2.45